Case Studies

Case Study: Meker for Kitchen — Project Costing, BOM Control & Production Efficiency in Odoo

Optima Solutions Team
February 13, 2026
7 min read
Case Study: Meker for Kitchen — Project Costing, BOM Control & Production Efficiency in Odoo
#Case Study#Odoo#Manufacturing#BOM#Project Costing#Quality Control

Client Overview

Meker for Kitchen delivers custom kitchen manufacturing projects where accurate costing, material control, and production planning are essential.

The Challenge

  • Limited visibility on project costs and margins
  • Material waste due to weak BOM and planning control
  • Delays caused by fragmented procurement and production workflows

The Odoo Solution

We implemented Odoo Manufacturing with structured product flows to control BOM usage, procurement timing, and project visibility.

Key Highlights

  • Improved BOM tracking and material planning
  • Better project-based visibility on delivery status and cost
  • Streamlined procurement aligned with production needs
  • Quality checkpoints for consistent output

Results

  • 35% improvement in production efficiency
  • 25% reduction in material waste
  • More accurate project costing and better profitability decisions
  • Improved delivery reliability and planning consistency

Conclusion

With manufacturing workflows connected in one system, Meker improved control over materials, time, and profitability—unlocking more scalable operations.

OST

Optima Solutions Team